Sato Hub
BlockBeats MCP verification record

Score history

BlockBeats MCP

Every Sato Hub Sato Score reading we have captured for this listing, one per day, each dated. Days we changed the scoring method are marked separately from days the project moved. How open, active and verifiable — not a safety, quality, or returns grade.

Score today

49

Change over 62d

-6

Days measured

62

Days missed

0

Sato Score, daily

2026-07-142026-09-13
02550751002026-07-20: Sato Hub changed the scoring method (55 → 56). Not a change by the project.2026-07-14: 55 (Medium)2026-07-15: 55 (Medium)2026-07-16: 55 (Medium)2026-07-17: 55 (Medium)2026-07-18: 55 (Medium)2026-07-19: 55 (Medium)2026-07-20: 56 (Medium)2026-07-21: 56 (Medium)2026-07-22: 56 (Medium)2026-07-23: 56 (Medium)2026-07-24: 56 (Medium)2026-07-25: 56 (Medium)2026-07-26: 56 (Medium)2026-07-27: 56 (Medium)2026-07-28: 56 (Medium)2026-07-29: 56 (Medium)2026-07-30: 56 (Medium)2026-07-31: 56 (Medium)2026-08-01: 56 (Medium)2026-08-02: 56 (Medium)2026-08-03: 56 (Medium)2026-08-04: 56 (Medium)2026-08-05: 56 (Medium)2026-08-06: 56 (Medium)2026-08-07: 56 (Medium)2026-08-08: 56 (Medium)2026-08-09: 56 (Medium)2026-08-10: 56 (Medium)2026-08-11: 56 (Medium)2026-08-12: 56 (Medium)2026-08-13: 56 (Medium)2026-08-14: 56 (Medium)2026-08-15: 56 (Medium)2026-08-16: 56 (Medium)2026-08-17: 56 (Medium)2026-08-18: 56 (Medium)2026-08-19: 56 (Medium)2026-08-20: 56 (Medium)2026-08-21: 49 (Medium)2026-08-22: 49 (Medium)2026-08-23: 49 (Medium)2026-08-24: 49 (Medium)2026-08-25: 49 (Medium)2026-08-26: 49 (Medium)2026-08-27: 49 (Medium)2026-08-28: 49 (Medium)2026-08-29: 49 (Medium)2026-08-30: 49 (Medium)2026-08-31: 49 (Medium)2026-09-01: 49 (Medium)2026-09-02: 49 (Medium)2026-09-03: 49 (Medium)2026-09-04: 49 (Medium)2026-09-05: 49 (Medium)2026-09-06: 49 (Medium)2026-09-07: 49 (Medium)2026-09-08: 49 (Medium)2026-09-09: 49 (Medium)2026-09-10: 49 (Medium)2026-09-11: 49 (Medium)2026-09-12: 49 (Medium)2026-09-13: 49 (Medium)5556492026-07-142026-09-13

Every day in this span has a reading. A dashed vertical mark () is a day Sato Hub changed the scoring method — movement on those days is ours, not the project’s.

Every day the score moved

1 change attributable to the project, 1 caused by a revision of the scoring method.

DateFromToChangeCause
2026-08-215649-7the project
2026-07-205556+1Sato Hub changed the scoring method

What moved, component by component

Six charts, six axes — each scaled to its own maximum weight. They are never stacked on one axis: a component worth 10 points and one worth 35 would not be comparable on a shared scale, and the small one is usually the one that moved.

Maintenance & liveness13/35
35
Code transparency18/20
20
Interface verifiability0/10
10
Docs & demo6/10
10
Listing transparency & provenance12/15
15
Independent verification0/10
10

The observed record

61.3% of Sato Hub's own daily checks succeeded over 62 checks. This is the share of OUR checks that succeeded. It is not uptime: a failed check can be on our side, and before 2026-09-01 no failure recorded why.

2026-07-14: answered our check2026-07-15: answered our check2026-07-16: answered our check2026-07-17: answered our check2026-07-18: answered our check2026-07-19: answered our check2026-07-20: answered our check2026-07-21: answered our check2026-07-22: answered our check2026-07-23: answered our check2026-07-24: answered our check2026-07-25: answered our check2026-07-26: answered our check2026-07-27: answered our check2026-07-28: answered our check2026-07-29: answered our check2026-07-30: answered our check2026-07-31: answered our check2026-08-01: answered our check2026-08-02: answered our check2026-08-03: answered our check2026-08-04: answered our check2026-08-05: answered our check2026-08-06: answered our check2026-08-07: answered our check2026-08-08: answered our check2026-08-09: answered our check2026-08-10: answered our check2026-08-11: answered our check2026-08-12: answered our check2026-08-13: answered our check2026-08-14: answered our check2026-08-15: answered our check2026-08-16: answered our check2026-08-17: answered our check2026-08-18: answered our check2026-08-19: answered our check2026-08-20: answered our check2026-08-21: failed, unattributable2026-08-22: failed, unattributable2026-08-23: failed, unattributable2026-08-24: failed, unattributable2026-08-25: failed, unattributable2026-08-26: failed, unattributable2026-08-27: failed, unattributable2026-08-28: failed, unattributable2026-08-29: failed, unattributable2026-08-30: failed, unattributable2026-08-31: failed, unattributable2026-09-01: failed on our side — not attributable to the project2026-09-02: failed on our side — not attributable to the project2026-09-03: failed on our side — not attributable to the project2026-09-04: failed on our side — not attributable to the project2026-09-05: failed on our side — not attributable to the project2026-09-06: failed on our side — not attributable to the project2026-09-07: failed on our side — not attributable to the project2026-09-08: failed on our side — not attributable to the project2026-09-09: failed on our side — not attributable to the project2026-09-10: failed on our side — not attributable to the project2026-09-11: failed on our side — not attributable to the project2026-09-12: failed on our side — not attributable to the project2026-09-13: failed on our side — not attributable to the project
  • answered
  • host answered with an error
  • failed on our side
  • failed, unattributable

Every reading

The table the charts are drawn from. A missing day is missing from this table too — nothing is filled in.

DateScoreTierStatusOur check
2026-09-1349MediumUnknowninconclusive
2026-09-1249MediumUnknowninconclusive
2026-09-1149MediumUnknowninconclusive
2026-09-1049MediumUnknowninconclusive
2026-09-0949MediumUnknowninconclusive
2026-09-0849MediumUnknowninconclusive
2026-09-0749MediumUnknowninconclusive
2026-09-0649MediumUnknowninconclusive
2026-09-0549MediumUnknowninconclusive
2026-09-0449MediumUnknowninconclusive
2026-09-0349MediumUnknowninconclusive
2026-09-0249MediumUnknowninconclusive
2026-09-0149MediumUnknowninconclusive
2026-08-3149MediumUnknownunknown
2026-08-3049MediumUnknownunknown
2026-08-2949MediumUnknownunknown
2026-08-2849MediumUnknownunknown
2026-08-2749MediumUnknownunknown
2026-08-2649MediumUnknownunknown
2026-08-2549MediumUnknownunknown
2026-08-2449MediumUnknownunknown
2026-08-2349MediumUnknownunknown
2026-08-2249MediumUnknownunknown
2026-08-2149MediumUnknownunknown
2026-08-2056MediumUnknownup
2026-08-1956MediumUnknownup
2026-08-1856MediumUnknownup
2026-08-1756MediumUnknownup
2026-08-1656MediumUnknownup
2026-08-1556MediumUnknownup
2026-08-1456MediumUnknownup
2026-08-1356MediumUnknownup
2026-08-1256MediumUnknownup
2026-08-1156MediumUnknownup
2026-08-1056MediumUnknownup
2026-08-0956MediumUnknownup
2026-08-0856MediumUnknownup
2026-08-0756MediumUnknownup
2026-08-0656MediumUnknownup
2026-08-0556MediumUnknownup
2026-08-0456MediumUnknownup
2026-08-0356MediumUnknownup
2026-08-0256MediumUnknownup
2026-08-0156MediumUnknownup
2026-07-3156MediumUnknownup
2026-07-3056MediumUnknownup
2026-07-2956MediumUnknownup
2026-07-2856MediumUnknownup
2026-07-2756MediumUnknownup
2026-07-2656MediumUnknownup
2026-07-2556MediumUnknownup
2026-07-2456MediumUnknownup
2026-07-2356MediumUnknownup
2026-07-2256MediumUnknownup
2026-07-2156MediumUnknownup
2026-07-2056MediumUnknownup
2026-07-1955MediumUnknownup
2026-07-1855MediumUnknownup
2026-07-1755MediumUnknownup
2026-07-1655MediumUnknownup
2026-07-1555MediumUnknownup
2026-07-1455MediumUnknownup

What happened alongside it

Releases, status changes, applied corrections and answered disputes, on the same dates — so a movement in the line can be read against an event rather than guessed at.

  1. Jul 20, 2026
    Edited: deploy spec
  2. Jul 14, 2026
    Auto-enriched: deployment options, supported integrations
  3. Jul 14, 2026
    Listed on Sato Hub
  4. Jul 14, 2026
    Sato Hub began tracking this listing

How to read this

  • · Every point is one UTC day. A day we did not capture is drawn as a gap, never joined across.
  • · A change on a marked methodology day is ours, not the project’s.
  • · The score says how open, active and verifiable the project is. It is not a safety, quality or returns grade.
  • · The inputs behind today’s score are published at /api/export/score-inputs.json and the arithmetic is reproducible on your own machine.