Sato Hub
ERC-8183: Agentic Commerce verification record

Score history

ERC-8183: Agentic Commerce

Every Sato Hub Sato Score reading we have captured for this listing, one per day, each dated. Days we changed the scoring method are marked separately from days the project moved. How open, active and verifiable — not a safety, quality, or returns grade.

Score today

69

Change over 90d

-1

Days measured

90

Days missed

4

Sato Score, daily

2026-06-112026-09-13
02550751002026-06-25: Sato Hub changed the scoring method (58 → 64). Not a change by the project.2026-07-14: Sato Hub changed the scoring method (85 → 78). Not a change by the project.2026-07-15: Sato Hub changed the scoring method (78 → 79). Not a change by the project.2026-06-12: 70 (High)2026-06-13: 70 (High)2026-06-14: 70 (High)2026-06-15: 70 (High)2026-06-16: 70 (High)2026-06-17: 70 (High)2026-06-18: 58 (Medium)2026-06-19: 58 (Medium)2026-06-20: 58 (Medium)2026-06-22: 58 (Medium)2026-06-24: 58 (Medium)2026-06-25: 64 (Medium)2026-06-26: 64 (Medium)2026-06-27: 64 (Medium)2026-06-30: 85 (High)2026-07-01: 85 (High)2026-07-02: 85 (High)2026-07-03: 85 (High)2026-07-04: 85 (High)2026-07-05: 85 (High)2026-07-06: 85 (High)2026-07-07: 85 (High)2026-07-08: 85 (High)2026-07-09: 85 (High)2026-07-10: 85 (High)2026-07-11: 85 (High)2026-07-12: 85 (High)2026-07-13: 85 (High)2026-07-14: 78 (High)2026-07-15: 79 (High)2026-07-16: 79 (High)2026-07-17: 79 (High)2026-07-18: 79 (High)2026-07-19: 79 (High)2026-07-20: 79 (High)2026-07-21: 79 (High)2026-07-22: 79 (High)2026-07-23: 79 (High)2026-07-24: 79 (High)2026-07-25: 79 (High)2026-07-26: 79 (High)2026-07-27: 79 (High)2026-07-28: 79 (High)2026-07-29: 79 (High)2026-07-30: 69 (Medium)2026-07-31: 69 (Medium)2026-08-01: 69 (Medium)2026-08-02: 69 (Medium)2026-08-03: 69 (Medium)2026-08-04: 69 (Medium)2026-08-05: 69 (Medium)2026-08-06: 69 (Medium)2026-08-07: 69 (Medium)2026-08-08: 69 (Medium)2026-08-09: 69 (Medium)2026-08-10: 69 (Medium)2026-08-11: 69 (Medium)2026-08-12: 69 (Medium)2026-08-13: 69 (Medium)2026-08-14: 69 (Medium)2026-08-15: 69 (Medium)2026-08-16: 69 (Medium)2026-08-17: 69 (Medium)2026-08-18: 69 (Medium)2026-08-19: 69 (Medium)2026-08-20: 69 (Medium)2026-08-21: 69 (Medium)2026-08-22: 69 (Medium)2026-08-23: 69 (Medium)2026-08-24: 69 (Medium)2026-08-25: 69 (Medium)2026-08-26: 69 (Medium)2026-08-27: 69 (Medium)2026-08-28: 69 (Medium)2026-08-29: 69 (Medium)2026-08-30: 69 (Medium)2026-08-31: 69 (Medium)2026-09-01: 69 (Medium)2026-09-02: 69 (Medium)2026-09-03: 69 (Medium)2026-09-04: 69 (Medium)2026-09-05: 69 (Medium)2026-09-06: 69 (Medium)2026-09-07: 69 (Medium)2026-09-08: 69 (Medium)2026-09-09: 69 (Medium)2026-09-10: 69 (Medium)2026-09-11: 69 (Medium)2026-09-12: 69 (Medium)2026-09-13: 69 (Medium)7085692026-06-122026-09-13

4 days in this span have no reading; the line breaks there rather than joining across them. A dashed vertical mark () is a day Sato Hub changed the scoring method — movement on those days is ours, not the project’s.

Every day the score moved

3 changes attributable to the project, 3 caused by a revision of the scoring method.

DateFromToChangeCause
2026-07-307969-10the project
2026-07-157879+1Sato Hub changed the scoring method
2026-07-148578-7Sato Hub changed the scoring method
2026-06-306485+21the project
2026-06-255864+6Sato Hub changed the scoring method
2026-06-187058-12the project

What moved, component by component

Six charts, six axes — each scaled to its own maximum weight. They are never stacked on one axis: a component worth 10 points and one worth 35 would not be comparable on a shared scale, and the small one is usually the one that moved.

Maintenance & liveness25/35
35
Code transparency17/20
20
Interface verifiability0/10
10
Docs & demo6/10
10
Listing transparency & provenance13/15
15
Independent verification8/10
10

The observed record

100% of Sato Hub's own daily checks succeeded over 62 checks. This is the share of OUR checks that succeeded. It is not uptime: a failed check can be on our side, and before 2026-09-01 no failure recorded why.

2026-07-14: answered our check2026-07-15: answered our check2026-07-16: answered our check2026-07-17: answered our check2026-07-18: answered our check2026-07-19: answered our check2026-07-20: answered our check2026-07-21: answered our check2026-07-22: answered our check2026-07-23: answered our check2026-07-24: answered our check2026-07-25: answered our check2026-07-26: answered our check2026-07-27: answered our check2026-07-28: answered our check2026-07-29: answered our check2026-07-30: answered our check2026-07-31: answered our check2026-08-01: answered our check2026-08-02: answered our check2026-08-03: answered our check2026-08-04: answered our check2026-08-05: answered our check2026-08-06: answered our check2026-08-07: answered our check2026-08-08: answered our check2026-08-09: answered our check2026-08-10: answered our check2026-08-11: answered our check2026-08-12: answered our check2026-08-13: answered our check2026-08-14: answered our check2026-08-15: answered our check2026-08-16: answered our check2026-08-17: answered our check2026-08-18: answered our check2026-08-19: answered our check2026-08-20: answered our check2026-08-21: answered our check2026-08-22: answered our check2026-08-23: answered our check2026-08-24: answered our check2026-08-25: answered our check2026-08-26: answered our check2026-08-27: answered our check2026-08-28: answered our check2026-08-29: answered our check2026-08-30: answered our check2026-08-31: answered our check2026-09-01: answered our check2026-09-02: answered our check2026-09-03: answered our check2026-09-04: answered our check2026-09-05: answered our check2026-09-06: answered our check2026-09-07: answered our check2026-09-08: answered our check2026-09-09: answered our check2026-09-10: answered our check2026-09-11: answered our check2026-09-12: answered our check2026-09-13: answered our check
  • answered
  • host answered with an error
  • failed on our side
  • failed, unattributable

Every reading

The table the charts are drawn from. A missing day is missing from this table too — nothing is filled in.

DateScoreTierStatusOur check
2026-09-1369MediumEarlyup
2026-09-1269MediumEarlyup
2026-09-1169MediumEarlyup
2026-09-1069MediumEarlyup
2026-09-0969MediumEarlyup
2026-09-0869MediumEarlyup
2026-09-0769MediumEarlyup
2026-09-0669MediumEarlyup
2026-09-0569MediumEarlyup
2026-09-0469MediumEarlyup
2026-09-0369MediumEarlyup
2026-09-0269MediumEarlyup
2026-09-0169MediumEarlyup
2026-08-3169MediumEarlyup
2026-08-3069MediumEarlyup
2026-08-2969MediumEarlyup
2026-08-2869MediumEarlyup
2026-08-2769MediumEarlyup
2026-08-2669MediumEarlyup
2026-08-2569MediumEarlyup
2026-08-2469MediumEarlyup
2026-08-2369MediumEarlyup
2026-08-2269MediumEarlyup
2026-08-2169MediumEarlyup
2026-08-2069MediumEarlyup
2026-08-1969MediumEarlyup
2026-08-1869MediumEarlyup
2026-08-1769MediumEarlyup
2026-08-1669MediumEarlyup
2026-08-1569MediumEarlyup
2026-08-1469MediumEarlyup
2026-08-1369MediumEarlyup
2026-08-1269MediumEarlyup
2026-08-1169MediumEarlyup
2026-08-1069MediumEarlyup
2026-08-0969MediumEarlyup
2026-08-0869MediumEarlyup
2026-08-0769MediumEarlyup
2026-08-0669MediumEarlyup
2026-08-0569MediumEarlyup
2026-08-0469MediumEarlyup
2026-08-0369MediumEarlyup
2026-08-0269MediumEarlyup
2026-08-0169MediumEarlyup
2026-07-3169MediumEarlyup
2026-07-3069MediumEarlyup
2026-07-2979HighEarlyup
2026-07-2879HighEarlyup
2026-07-2779HighEarlyup
2026-07-2679HighEarlyup
2026-07-2579HighEarlyup
2026-07-2479HighEarlyup
2026-07-2379HighEarlyup
2026-07-2279HighEarlyup
2026-07-2179HighEarlyup
2026-07-2079HighEarlyup
2026-07-1979HighEarlyup
2026-07-1879HighEarlyup
2026-07-1779HighEarlyup
2026-07-1679HighEarlyup
2026-07-1579HighEarlyup
2026-07-1478HighEarlyup
2026-07-1385HighEarlynot checked
2026-07-1285HighEarlynot checked
2026-07-1185HighEarlynot checked
2026-07-1085HighEarlynot checked
2026-07-0985HighEarlynot checked
2026-07-0885HighEarlynot checked
2026-07-0785HighEarlynot checked
2026-07-0685HighEarlynot checked
2026-07-0585HighEarlynot checked
2026-07-0485HighEarlynot checked
2026-07-0385HighEarlynot checked
2026-07-0285HighEarlynot checked
2026-07-0185HighEarlynot checked
2026-06-3085HighEarlynot checked
2026-06-2764MediumEarlynot checked
2026-06-2664MediumEarlynot checked
2026-06-2564MediumEarlynot checked
2026-06-2458MediumEarlynot checked
2026-06-2258MediumEarlynot checked
2026-06-2058MediumEarlynot checked
2026-06-1958MediumEarlynot checked
2026-06-1858MediumEarlynot checked
2026-06-1770HighEarlynot checked
2026-06-1670HighEarlynot checked
2026-06-1570HighEarlynot checked
2026-06-1470HighEarlynot checked
2026-06-1370HighEarlynot checked
2026-06-1270HighEarlynot checked
2026-06-11unknownEarlynot checked

What happened alongside it

Releases, status changes, applied corrections and answered disputes, on the same dates — so a movement in the line can be read against an event rather than guessed at.

  1. Jul 30, 2026
    Sato Score tier: High → Medium
    Score 79 → 69.
  2. Jul 14, 2026
    Edited: deploy spec
  3. Jun 30, 2026
    Sato Score tier: Medium → High
    Score 64 → 85.
  4. Jun 30, 2026
    Active again — shipped after a quiet spell
  5. Jun 25, 2026
    Enriched: creator name, creator profile url, marketplace notes
  6. Jun 25, 2026
    Auto-enriched: supported integrations
  7. Jun 18, 2026
    Sato Score tier: High → Medium
    Score 70 → 58.
  8. Jun 12, 2026
    Sato Hub began tracking this listing

How to read this

  • · Every point is one UTC day. A day we did not capture is drawn as a gap, never joined across.
  • · A change on a marked methodology day is ours, not the project’s.
  • · The score says how open, active and verifiable the project is. It is not a safety, quality or returns grade.
  • · The inputs behind today’s score are published at /api/export/score-inputs.json and the arithmetic is reproducible on your own machine.