Sato Hub
Fewsats verification record

Score history

Fewsats

Every Sato Hub Sato Score reading we have captured for this listing, one per day, each dated. Days we changed the scoring method are marked separately from days the project moved. How open, active and verifiable — not a safety, quality, or returns grade.

Score today

43

Change over 57d

+6

Days measured

57

Days missed

0

Sato Score, daily

2026-07-192026-09-13
02550751002026-07-20: Sato Hub changed the scoring method (37 → 38). Not a change by the project.2026-09-01: Sato Hub changed the scoring method (40 → 43). Not a change by the project.2026-07-19: 37 (Low)2026-07-20: 38 (Low)2026-07-21: 40 (Medium)2026-07-22: 40 (Medium)2026-07-23: 40 (Medium)2026-07-24: 40 (Medium)2026-07-25: 40 (Medium)2026-07-26: 40 (Medium)2026-07-27: 40 (Medium)2026-07-28: 40 (Medium)2026-07-29: 40 (Medium)2026-07-30: 40 (Medium)2026-07-31: 40 (Medium)2026-08-01: 40 (Medium)2026-08-02: 40 (Medium)2026-08-03: 40 (Medium)2026-08-04: 40 (Medium)2026-08-05: 40 (Medium)2026-08-06: 40 (Medium)2026-08-07: 40 (Medium)2026-08-08: 40 (Medium)2026-08-09: 40 (Medium)2026-08-10: 40 (Medium)2026-08-11: 40 (Medium)2026-08-12: 40 (Medium)2026-08-13: 40 (Medium)2026-08-14: 40 (Medium)2026-08-15: 40 (Medium)2026-08-16: 40 (Medium)2026-08-17: 40 (Medium)2026-08-18: 40 (Medium)2026-08-19: 40 (Medium)2026-08-20: 40 (Medium)2026-08-21: 40 (Medium)2026-08-22: 40 (Medium)2026-08-23: 40 (Medium)2026-08-24: 40 (Medium)2026-08-25: 40 (Medium)2026-08-26: 40 (Medium)2026-08-27: 40 (Medium)2026-08-28: 40 (Medium)2026-08-29: 40 (Medium)2026-08-30: 40 (Medium)2026-08-31: 40 (Medium)2026-09-01: 43 (Medium)2026-09-02: 43 (Medium)2026-09-03: 43 (Medium)2026-09-04: 43 (Medium)2026-09-05: 43 (Medium)2026-09-06: 43 (Medium)2026-09-07: 43 (Medium)2026-09-08: 43 (Medium)2026-09-09: 43 (Medium)2026-09-10: 43 (Medium)2026-09-11: 43 (Medium)2026-09-12: 43 (Medium)2026-09-13: 43 (Medium)3743432026-07-192026-09-13

Every day in this span has a reading. A dashed vertical mark () is a day Sato Hub changed the scoring method — movement on those days is ours, not the project’s.

Every day the score moved

1 change attributable to the project, 2 caused by a revision of the scoring method.

DateFromToChangeCause
2026-09-014043+3Sato Hub changed the scoring method
2026-07-213840+2the project
2026-07-203738+1Sato Hub changed the scoring method

What moved, component by component

Six charts, six axes — each scaled to its own maximum weight. They are never stacked on one axis: a component worth 10 points and one worth 35 would not be comparable on a shared scale, and the small one is usually the one that moved.

Maintenance & liveness20/35
35
Code transparency14/20
20
Interface verifiability0/10
10
Docs & demo0/10
10
Listing transparency & provenance6/15
15
Independent verification3/10
10

The observed record

100% of Sato Hub's own daily checks succeeded over 57 checks. This is the share of OUR checks that succeeded. It is not uptime: a failed check can be on our side, and before 2026-09-01 no failure recorded why.

2026-07-19: answered our check2026-07-20: answered our check2026-07-21: answered our check2026-07-22: answered our check2026-07-23: answered our check2026-07-24: answered our check2026-07-25: answered our check2026-07-26: answered our check2026-07-27: answered our check2026-07-28: answered our check2026-07-29: answered our check2026-07-30: answered our check2026-07-31: answered our check2026-08-01: answered our check2026-08-02: answered our check2026-08-03: answered our check2026-08-04: answered our check2026-08-05: answered our check2026-08-06: answered our check2026-08-07: answered our check2026-08-08: answered our check2026-08-09: answered our check2026-08-10: answered our check2026-08-11: answered our check2026-08-12: answered our check2026-08-13: answered our check2026-08-14: answered our check2026-08-15: answered our check2026-08-16: answered our check2026-08-17: answered our check2026-08-18: answered our check2026-08-19: answered our check2026-08-20: answered our check2026-08-21: answered our check2026-08-22: answered our check2026-08-23: answered our check2026-08-24: answered our check2026-08-25: answered our check2026-08-26: answered our check2026-08-27: answered our check2026-08-28: answered our check2026-08-29: answered our check2026-08-30: answered our check2026-08-31: answered our check2026-09-01: answered our check2026-09-02: answered our check2026-09-03: answered our check2026-09-04: answered our check2026-09-05: answered our check2026-09-06: answered our check2026-09-07: answered our check2026-09-08: answered our check2026-09-09: answered our check2026-09-10: answered our check2026-09-11: answered our check2026-09-12: answered our check2026-09-13: answered our check
  • answered
  • host answered with an error
  • failed on our side
  • failed, unattributable

Every reading

The table the charts are drawn from. A missing day is missing from this table too — nothing is filled in.

DateScoreTierStatusOur check
2026-09-1343MediumUnknownup
2026-09-1243MediumUnknownup
2026-09-1143MediumUnknownup
2026-09-1043MediumUnknownup
2026-09-0943MediumUnknownup
2026-09-0843MediumUnknownup
2026-09-0743MediumUnknownup
2026-09-0643MediumUnknownup
2026-09-0543MediumUnknownup
2026-09-0443MediumUnknownup
2026-09-0343MediumUnknownup
2026-09-0243MediumUnknownup
2026-09-0143MediumUnknownup
2026-08-3140MediumUnknownup
2026-08-3040MediumUnknownup
2026-08-2940MediumUnknownup
2026-08-2840MediumUnknownup
2026-08-2740MediumUnknownup
2026-08-2640MediumUnknownup
2026-08-2540MediumUnknownup
2026-08-2440MediumUnknownup
2026-08-2340MediumUnknownup
2026-08-2240MediumUnknownup
2026-08-2140MediumUnknownup
2026-08-2040MediumUnknownup
2026-08-1940MediumUnknownup
2026-08-1840MediumUnknownup
2026-08-1740MediumUnknownup
2026-08-1640MediumUnknownup
2026-08-1540MediumUnknownup
2026-08-1440MediumUnknownup
2026-08-1340MediumUnknownup
2026-08-1240MediumUnknownup
2026-08-1140MediumUnknownup
2026-08-1040MediumUnknownup
2026-08-0940MediumUnknownup
2026-08-0840MediumUnknownup
2026-08-0740MediumUnknownup
2026-08-0640MediumUnknownup
2026-08-0540MediumUnknownup
2026-08-0440MediumUnknownup
2026-08-0340MediumUnknownup
2026-08-0240MediumUnknownup
2026-08-0140MediumUnknownup
2026-07-3140MediumUnknownup
2026-07-3040MediumUnknownup
2026-07-2940MediumUnknownup
2026-07-2840MediumUnknownup
2026-07-2740MediumUnknownup
2026-07-2640MediumUnknownup
2026-07-2540MediumUnknownup
2026-07-2440MediumUnknownup
2026-07-2340MediumUnknownup
2026-07-2240MediumUnknownup
2026-07-2140MediumUnknownup
2026-07-2038LowUnknownup
2026-07-1937LowUnknownup

What happened alongside it

Releases, status changes, applied corrections and answered disputes, on the same dates — so a movement in the line can be read against an event rather than guessed at.

  1. Jul 20, 2026
    Edited: deploy spec
  2. Jul 19, 2026
    Listed on Sato Hub
  3. Jul 19, 2026
    Sato Hub began tracking this listing

How to read this

  • · Every point is one UTC day. A day we did not capture is drawn as a gap, never joined across.
  • · A change on a marked methodology day is ours, not the project’s.
  • · The score says how open, active and verifiable the project is. It is not a safety, quality or returns grade.
  • · The inputs behind today’s score are published at /api/export/score-inputs.json and the arithmetic is reproducible on your own machine.