Sato Hub
IronClaw verification record

Score history

IronClaw

Every Sato Hub Sato Score reading we have captured for this listing, one per day, each dated. Days we changed the scoring method are marked separately from days the project moved. How open, active and verifiable — not a safety, quality, or returns grade.

Score today

64

Change over 57d

+8

Days measured

57

Days missed

0

Sato Score, daily

2026-07-192026-09-13
02550751002026-07-20: Sato Hub changed the scoring method (56 → 57). Not a change by the project.2026-09-01: Sato Hub changed the scoring method (61 → 64). Not a change by the project.2026-07-19: 56 (Medium)2026-07-20: 57 (Medium)2026-07-21: 61 (Medium)2026-07-22: 61 (Medium)2026-07-23: 61 (Medium)2026-07-24: 61 (Medium)2026-07-25: 61 (Medium)2026-07-26: 61 (Medium)2026-07-27: 61 (Medium)2026-07-28: 61 (Medium)2026-07-29: 61 (Medium)2026-07-30: 61 (Medium)2026-07-31: 61 (Medium)2026-08-01: 61 (Medium)2026-08-02: 61 (Medium)2026-08-03: 61 (Medium)2026-08-04: 61 (Medium)2026-08-05: 61 (Medium)2026-08-06: 61 (Medium)2026-08-07: 61 (Medium)2026-08-08: 61 (Medium)2026-08-09: 61 (Medium)2026-08-10: 61 (Medium)2026-08-11: 61 (Medium)2026-08-12: 61 (Medium)2026-08-13: 61 (Medium)2026-08-14: 61 (Medium)2026-08-15: 61 (Medium)2026-08-16: 61 (Medium)2026-08-17: 61 (Medium)2026-08-18: 61 (Medium)2026-08-19: 61 (Medium)2026-08-20: 61 (Medium)2026-08-21: 61 (Medium)2026-08-22: 61 (Medium)2026-08-23: 61 (Medium)2026-08-24: 61 (Medium)2026-08-25: 61 (Medium)2026-08-26: 61 (Medium)2026-08-27: 61 (Medium)2026-08-28: 61 (Medium)2026-08-29: 61 (Medium)2026-08-30: 61 (Medium)2026-08-31: 61 (Medium)2026-09-01: 64 (Medium)2026-09-02: 64 (Medium)2026-09-03: 64 (Medium)2026-09-04: 64 (Medium)2026-09-05: 64 (Medium)2026-09-06: 64 (Medium)2026-09-07: 64 (Medium)2026-09-08: 64 (Medium)2026-09-09: 64 (Medium)2026-09-10: 64 (Medium)2026-09-11: 64 (Medium)2026-09-12: 64 (Medium)2026-09-13: 64 (Medium)5664642026-07-192026-09-13

Every day in this span has a reading. A dashed vertical mark () is a day Sato Hub changed the scoring method — movement on those days is ours, not the project’s.

Every day the score moved

1 change attributable to the project, 2 caused by a revision of the scoring method.

DateFromToChangeCause
2026-09-016164+3Sato Hub changed the scoring method
2026-07-215761+4the project
2026-07-205657+1Sato Hub changed the scoring method

What moved, component by component

Six charts, six axes — each scaled to its own maximum weight. They are never stacked on one axis: a component worth 10 points and one worth 35 would not be comparable on a shared scale, and the small one is usually the one that moved.

Maintenance & liveness35/35
35
Code transparency20/20
20
Interface verifiability0/10
10
Docs & demo0/10
10
Listing transparency & provenance6/15
15
Independent verification3/10
10

The observed record

100% of Sato Hub's own daily checks succeeded over 57 checks. This is the share of OUR checks that succeeded. It is not uptime: a failed check can be on our side, and before 2026-09-01 no failure recorded why.

2026-07-19: answered our check2026-07-20: answered our check2026-07-21: answered our check2026-07-22: answered our check2026-07-23: answered our check2026-07-24: answered our check2026-07-25: answered our check2026-07-26: answered our check2026-07-27: answered our check2026-07-28: answered our check2026-07-29: answered our check2026-07-30: answered our check2026-07-31: answered our check2026-08-01: answered our check2026-08-02: answered our check2026-08-03: answered our check2026-08-04: answered our check2026-08-05: answered our check2026-08-06: answered our check2026-08-07: answered our check2026-08-08: answered our check2026-08-09: answered our check2026-08-10: answered our check2026-08-11: answered our check2026-08-12: answered our check2026-08-13: answered our check2026-08-14: answered our check2026-08-15: answered our check2026-08-16: answered our check2026-08-17: answered our check2026-08-18: answered our check2026-08-19: answered our check2026-08-20: answered our check2026-08-21: answered our check2026-08-22: answered our check2026-08-23: answered our check2026-08-24: answered our check2026-08-25: answered our check2026-08-26: answered our check2026-08-27: answered our check2026-08-28: answered our check2026-08-29: answered our check2026-08-30: answered our check2026-08-31: answered our check2026-09-01: answered our check2026-09-02: answered our check2026-09-03: answered our check2026-09-04: answered our check2026-09-05: answered our check2026-09-06: answered our check2026-09-07: answered our check2026-09-08: answered our check2026-09-09: answered our check2026-09-10: answered our check2026-09-11: answered our check2026-09-12: answered our check2026-09-13: answered our check
  • answered
  • host answered with an error
  • failed on our side
  • failed, unattributable

Every reading

The table the charts are drawn from. A missing day is missing from this table too — nothing is filled in.

DateScoreTierStatusOur check
2026-09-1364MediumActiveup
2026-09-1264MediumActiveup
2026-09-1164MediumActiveup
2026-09-1064MediumActiveup
2026-09-0964MediumActiveup
2026-09-0864MediumActiveup
2026-09-0764MediumActiveup
2026-09-0664MediumActiveup
2026-09-0564MediumActiveup
2026-09-0464MediumActiveup
2026-09-0364MediumActiveup
2026-09-0264MediumActiveup
2026-09-0164MediumActiveup
2026-08-3161MediumActiveup
2026-08-3061MediumActiveup
2026-08-2961MediumActiveup
2026-08-2861MediumActiveup
2026-08-2761MediumActiveup
2026-08-2661MediumActiveup
2026-08-2561MediumActiveup
2026-08-2461MediumActiveup
2026-08-2361MediumActiveup
2026-08-2261MediumActiveup
2026-08-2161MediumActiveup
2026-08-2061MediumActiveup
2026-08-1961MediumActiveup
2026-08-1861MediumActiveup
2026-08-1761MediumActiveup
2026-08-1661MediumActiveup
2026-08-1561MediumActiveup
2026-08-1461MediumActiveup
2026-08-1361MediumActiveup
2026-08-1261MediumActiveup
2026-08-1161MediumActiveup
2026-08-1061MediumActiveup
2026-08-0961MediumActiveup
2026-08-0861MediumActiveup
2026-08-0761MediumActiveup
2026-08-0661MediumActiveup
2026-08-0561MediumActiveup
2026-08-0461MediumActiveup
2026-08-0361MediumActiveup
2026-08-0261MediumActiveup
2026-08-0161MediumActiveup
2026-07-3161MediumActiveup
2026-07-3061MediumActiveup
2026-07-2961MediumActiveup
2026-07-2861MediumActiveup
2026-07-2761MediumActiveup
2026-07-2661MediumActiveup
2026-07-2561MediumActiveup
2026-07-2461MediumActiveup
2026-07-2361MediumActiveup
2026-07-2261MediumActiveup
2026-07-2161MediumActiveup
2026-07-2057MediumActiveup
2026-07-1956MediumActiveup

What happened alongside it

Releases, status changes, applied corrections and answered disputes, on the same dates — so a movement in the line can be read against an event rather than guessed at.

  1. Aug 28, 2026
    New release published
  2. Aug 27, 2026
    New release published
  3. Jul 21, 2026
    14 releases tracked
    Showing the 2 most recent. Full release history is retained in the listing record.
  4. Jul 20, 2026
    Edited: deploy spec
  5. Jul 19, 2026
    Listed on Sato Hub
  6. Jul 19, 2026
    Sato Hub began tracking this listing

How to read this

  • · Every point is one UTC day. A day we did not capture is drawn as a gap, never joined across.
  • · A change on a marked methodology day is ours, not the project’s.
  • · The score says how open, active and verifiable the project is. It is not a safety, quality or returns grade.
  • · The inputs behind today’s score are published at /api/export/score-inputs.json and the arithmetic is reproducible on your own machine.