One dated Sato Score reading per day. Days we changed the scoring method are marked. Not a safety or returns grade.
Score today
20
Change over 51d
0
Days measured
51
Days missed
0
Sato Score, daily
2026-10-09 → 2026-11-28
Every day in this span has a reading. A dashed vertical mark (┆) is a day Sato Hub changed the scoring method — movement on those days is ours, not the project’s.
What moved, component by component
Six charts, six axes — each scaled to its own maximum weight. They are never stacked on one axis: a component worth 10 points and one worth 35 would not be comparable on a shared scale, and the small one is usually the one that moved.
0% of 51 daily checks since 2026-10-09 succeeded. This is the share of OUR checks that succeeded. It is not uptime: a failed check can be on our side. When a check before 2026-09-01 failed, the checks before that date are left out of the rate: the probe counted a bot-block as a failure then and recorded no reason for any failure.
answered
host answered with an error
failed on our side
failed, unattributable
Every reading
The table the charts are drawn from. A missing day is missing from this table too — nothing is filled in.
Date
Score
Tier
Status
Our check
2026-11-28
20
Low
Unknown
inconclusive
2026-11-27
20
Low
Unknown
inconclusive
2026-11-26
20
Low
Unknown
inconclusive
2026-11-25
20
Low
Unknown
inconclusive
2026-11-24
20
Low
Unknown
inconclusive
2026-11-23
20
Low
Unknown
inconclusive
2026-11-22
20
Low
Unknown
inconclusive
2026-11-21
20
Low
Unknown
inconclusive
2026-11-20
20
Low
Unknown
inconclusive
2026-11-19
20
Low
Unknown
inconclusive
2026-11-18
20
Low
Unknown
inconclusive
2026-11-17
20
Low
Unknown
inconclusive
2026-11-16
20
Low
Unknown
inconclusive
2026-11-15
20
Low
Unknown
inconclusive
2026-11-14
20
Low
Unknown
inconclusive
2026-11-13
20
Low
Unknown
inconclusive
2026-11-12
20
Low
Unknown
inconclusive
2026-11-11
20
Low
Unknown
inconclusive
2026-11-10
20
Low
Unknown
inconclusive
2026-11-09
20
Low
Unknown
inconclusive
2026-11-08
20
Low
Unknown
inconclusive
2026-11-07
20
Low
Unknown
inconclusive
2026-11-06
20
Low
Unknown
inconclusive
2026-11-05
20
Low
Unknown
inconclusive
2026-11-04
20
Low
Unknown
inconclusive
2026-11-03
20
Low
Unknown
inconclusive
2026-11-02
20
Low
Unknown
inconclusive
2026-11-01
20
Low
Unknown
inconclusive
2026-10-31
20
Low
Unknown
inconclusive
2026-10-30
20
Low
Unknown
inconclusive
2026-10-29
20
Low
Unknown
inconclusive
2026-10-28
20
Low
Unknown
inconclusive
2026-10-27
20
Low
Unknown
inconclusive
2026-10-26
20
Low
Unknown
inconclusive
2026-10-25
20
Low
Unknown
inconclusive
2026-10-24
20
Low
Unknown
inconclusive
2026-10-23
20
Low
Unknown
inconclusive
2026-10-22
20
Low
Unknown
inconclusive
2026-10-21
20
Low
Unknown
inconclusive
2026-10-20
20
Low
Unknown
inconclusive
2026-10-19
20
Low
Unknown
inconclusive
2026-10-18
20
Low
Unknown
inconclusive
2026-10-17
20
Low
Unknown
inconclusive
2026-10-16
20
Low
Unknown
inconclusive
2026-10-15
20
Low
Unknown
inconclusive
2026-10-14
20
Low
Unknown
inconclusive
2026-10-13
20
Low
Unknown
inconclusive
2026-10-12
20
Low
Unknown
inconclusive
2026-10-11
20
Low
Unknown
inconclusive
2026-10-10
20
Low
Unknown
inconclusive
2026-10-09
20
Low
Unknown
inconclusive
What happened alongside it
Releases, status changes, applied corrections and answered disputes, on the same dates — so a movement in the line can be read against an event rather than guessed at.
Oct 9, 2026
Sato Hub began tracking this listing
How to read this
· Every point is one UTC day. A day we did not capture is drawn as a gap, never joined across.
· A change on a marked methodology day is ours, not the project’s.
· The score says how open, active and verifiable the project is. It is not a safety, quality or returns grade.