Sato Hub
Tempo MPP Specs verification record

Score history

Tempo MPP Specs

Every Sato Hub Sato Score reading we have captured for this listing, one per day, each dated. Days we changed the scoring method are marked separately from days the project moved. How open, active and verifiable — not a safety, quality, or returns grade.

Score today

63

Change over 57d

+7

Days measured

57

Days missed

0

Sato Score, daily

2026-07-192026-09-13
02550751002026-09-01: Sato Hub changed the scoring method (60 → 63). Not a change by the project.2026-07-19: 56 (Medium)2026-07-20: 56 (Medium)2026-07-21: 58 (Medium)2026-07-22: 58 (Medium)2026-07-23: 58 (Medium)2026-07-24: 58 (Medium)2026-07-25: 58 (Medium)2026-07-26: 58 (Medium)2026-07-27: 58 (Medium)2026-07-28: 58 (Medium)2026-07-29: 58 (Medium)2026-07-30: 58 (Medium)2026-07-31: 58 (Medium)2026-08-01: 58 (Medium)2026-08-02: 58 (Medium)2026-08-03: 58 (Medium)2026-08-04: 58 (Medium)2026-08-05: 58 (Medium)2026-08-06: 58 (Medium)2026-08-07: 58 (Medium)2026-08-08: 60 (Medium)2026-08-09: 60 (Medium)2026-08-10: 60 (Medium)2026-08-11: 60 (Medium)2026-08-12: 60 (Medium)2026-08-13: 60 (Medium)2026-08-14: 60 (Medium)2026-08-15: 60 (Medium)2026-08-16: 60 (Medium)2026-08-17: 60 (Medium)2026-08-18: 60 (Medium)2026-08-19: 60 (Medium)2026-08-20: 60 (Medium)2026-08-21: 60 (Medium)2026-08-22: 60 (Medium)2026-08-23: 60 (Medium)2026-08-24: 60 (Medium)2026-08-25: 60 (Medium)2026-08-26: 60 (Medium)2026-08-27: 60 (Medium)2026-08-28: 60 (Medium)2026-08-29: 60 (Medium)2026-08-30: 60 (Medium)2026-08-31: 60 (Medium)2026-09-01: 63 (Medium)2026-09-02: 63 (Medium)2026-09-03: 63 (Medium)2026-09-04: 63 (Medium)2026-09-05: 63 (Medium)2026-09-06: 63 (Medium)2026-09-07: 63 (Medium)2026-09-08: 63 (Medium)2026-09-09: 63 (Medium)2026-09-10: 63 (Medium)2026-09-11: 63 (Medium)2026-09-12: 63 (Medium)2026-09-13: 63 (Medium)5663632026-07-192026-09-13

Every day in this span has a reading. A dashed vertical mark () is a day Sato Hub changed the scoring method — movement on those days is ours, not the project’s.

Every day the score moved

2 changes attributable to the project, 1 caused by a revision of the scoring method.

DateFromToChangeCause
2026-09-016063+3Sato Hub changed the scoring method
2026-08-085860+2the project
2026-07-215658+2the project

What moved, component by component

Six charts, six axes — each scaled to its own maximum weight. They are never stacked on one axis: a component worth 10 points and one worth 35 would not be comparable on a shared scale, and the small one is usually the one that moved.

Maintenance & liveness35/35
35
Code transparency18/20
20
Interface verifiability0/10
10
Docs & demo0/10
10
Listing transparency & provenance7/15
15
Independent verification3/10
10

The observed record

100% of Sato Hub's own daily checks succeeded over 57 checks. This is the share of OUR checks that succeeded. It is not uptime: a failed check can be on our side, and before 2026-09-01 no failure recorded why.

2026-07-19: answered our check2026-07-20: answered our check2026-07-21: answered our check2026-07-22: answered our check2026-07-23: answered our check2026-07-24: answered our check2026-07-25: answered our check2026-07-26: answered our check2026-07-27: answered our check2026-07-28: answered our check2026-07-29: answered our check2026-07-30: answered our check2026-07-31: answered our check2026-08-01: answered our check2026-08-02: answered our check2026-08-03: answered our check2026-08-04: answered our check2026-08-05: answered our check2026-08-06: answered our check2026-08-07: answered our check2026-08-08: answered our check2026-08-09: answered our check2026-08-10: answered our check2026-08-11: answered our check2026-08-12: answered our check2026-08-13: answered our check2026-08-14: answered our check2026-08-15: answered our check2026-08-16: answered our check2026-08-17: answered our check2026-08-18: answered our check2026-08-19: answered our check2026-08-20: answered our check2026-08-21: answered our check2026-08-22: answered our check2026-08-23: answered our check2026-08-24: answered our check2026-08-25: answered our check2026-08-26: answered our check2026-08-27: answered our check2026-08-28: answered our check2026-08-29: answered our check2026-08-30: answered our check2026-08-31: answered our check2026-09-01: answered our check2026-09-02: answered our check2026-09-03: answered our check2026-09-04: answered our check2026-09-05: answered our check2026-09-06: answered our check2026-09-07: answered our check2026-09-08: answered our check2026-09-09: answered our check2026-09-10: answered our check2026-09-11: answered our check2026-09-12: answered our check2026-09-13: answered our check
  • answered
  • host answered with an error
  • failed on our side
  • failed, unattributable

Every reading

The table the charts are drawn from. A missing day is missing from this table too — nothing is filled in.

DateScoreTierStatusOur check
2026-09-1363MediumActiveup
2026-09-1263MediumActiveup
2026-09-1163MediumActiveup
2026-09-1063MediumActiveup
2026-09-0963MediumActiveup
2026-09-0863MediumActiveup
2026-09-0763MediumActiveup
2026-09-0663MediumActiveup
2026-09-0563MediumActiveup
2026-09-0463MediumActiveup
2026-09-0363MediumActiveup
2026-09-0263MediumActiveup
2026-09-0163MediumActiveup
2026-08-3160MediumActiveup
2026-08-3060MediumActiveup
2026-08-2960MediumActiveup
2026-08-2860MediumActiveup
2026-08-2760MediumActiveup
2026-08-2660MediumActiveup
2026-08-2560MediumActiveup
2026-08-2460MediumActiveup
2026-08-2360MediumActiveup
2026-08-2260MediumActiveup
2026-08-2160MediumActiveup
2026-08-2060MediumActiveup
2026-08-1960MediumActiveup
2026-08-1860MediumActiveup
2026-08-1760MediumActiveup
2026-08-1660MediumActiveup
2026-08-1560MediumActiveup
2026-08-1460MediumActiveup
2026-08-1360MediumActiveup
2026-08-1260MediumActiveup
2026-08-1160MediumActiveup
2026-08-1060MediumActiveup
2026-08-0960MediumActiveup
2026-08-0860MediumActiveup
2026-08-0758MediumActiveup
2026-08-0658MediumActiveup
2026-08-0558MediumActiveup
2026-08-0458MediumActiveup
2026-08-0358MediumActiveup
2026-08-0258MediumActiveup
2026-08-0158MediumActiveup
2026-07-3158MediumActiveup
2026-07-3058MediumActiveup
2026-07-2958MediumActiveup
2026-07-2858MediumActiveup
2026-07-2758MediumActiveup
2026-07-2658MediumActiveup
2026-07-2558MediumActiveup
2026-07-2458MediumActiveup
2026-07-2358MediumActiveup
2026-07-2258MediumActiveup
2026-07-2158MediumActiveup
2026-07-2056MediumActiveup
2026-07-1956MediumActiveup

What happened alongside it

Releases, status changes, applied corrections and answered disputes, on the same dates — so a movement in the line can be read against an event rather than guessed at.

  1. Sep 9, 2026
    New release published
  2. Sep 8, 2026
    New release published
  3. Aug 8, 2026
    Auto-enriched: creator name
  4. Jul 21, 2026
    16 releases tracked
    Showing the 2 most recent. Full release history is retained in the listing record.
  5. Jul 19, 2026
    Edited: chains supported
  6. Jul 19, 2026
    Listed on Sato Hub
  7. Jul 19, 2026
    Sato Hub began tracking this listing

How to read this

  • · Every point is one UTC day. A day we did not capture is drawn as a gap, never joined across.
  • · A change on a marked methodology day is ours, not the project’s.
  • · The score says how open, active and verifiable the project is. It is not a safety, quality or returns grade.
  • · The inputs behind today’s score are published at /api/export/score-inputs.json and the arithmetic is reproducible on your own machine.